This item requests $10.72 Million in bonds for the construction portion of project RB03L-3078,
regarding Pondfield Road West over Bronx River. The design phase has been completed by
outside consultant and the department has been coordinating with the City of Yonkers for this
project. The bridge’s infrastructure will be replaced, as well as stones, concrete and other
associated work will be covered. In 2025, New York State rated the bridge with 4.31 and the
average annual daily traffic is over 5,530 vehicles. Detour routes will be outlined while
construction is going on and include temporary pedestrian walkways. This rehabilitation will
contribute a lifespan of about 30 to 50 years. Construction will be conducted with a two-phase
approach and is anticipated to take 24 months.
On motion of Legislator Tubiolo, seconded by Legislator Williams, the above item was signed
by committee and referred to Board of Legislators. The motion carried by the following vote:
Aye:
Legislator Woodson-Samuels, Legislator Pierce, Legislator Tubiolo, Legislator
Williams and Legislator Williams Johnson
Absent:
Remote:
Legislator Holstein
Legislator Nambiar
2.
BOND ACT-BPL26-3131-Flood Mitigation
A BOND ACT authorizing the issuance of ONE MILLION, EIGHT HUNDRED FIFTY
THOUSAND ($1,850,000) DOLLARS in bonds of Westchester County to finance Capital
Project BPL26 (3131) Flood Mitigation.
SUBMITTED BY: COMMITTEES ON BUDGET & APPROPRIATIONS AND
INFRASTRUCTURE & HOUSING
Joint with I&H
Guests: Department of Planning
Commissioner Blanca Lopez and Deputy Commissioner David Kvinge
This item was discussed in conjunction with item #3. The first item requests $1.85 Million in
bonds for design costs and the second item authorizes the entering into an inter-municipal
agreement (IMA) with the Village of Mamaroneck regarding the replacement of the Ward
Avenue Bridge. This is a component of the Army Corps of Engineers’ study that has been
ongoing since 2007, titled the Mamaroneck and Sheldrake Rivers General Reevaluation
Study. The removal and replacement of this bridge is advised from this project and the County
will be receiving credit from the Army Corps in exchange. The non-federal portion will be split
with the New York State Department of Environmental Conservation (DEC), reducing the
County’s contribution. Design is anticipated to take about 12 to 18 months.
On motion of Legislator Nambiar, seconded by Legislator Pierce, the above item was signed
by committee and referred to Board of Legislators. The motion carried by the following vote:
Aye:
Legislator Woodson-Samuels, Legislator Pierce, Legislator Tubiolo, Legislator
Williams and Legislator Williams Johnson